# Compact substations: electrical, civil and delivery interfaces | Kestvan

Prepare a compact-substation specification covering the single-line diagram, thermal conditions, cable entries, foundation, access and delivery interfaces.

Canonical page: https://kestvan.com/guides/compact-substation-project-interfaces

[Kestvan](https://kestvan.com/)

[Technical knowledge](https://kestvan.com/knowledge-center)

[All technical guides](https://kestvan.com/knowledge-center)

A prefabricated substation joins electrical equipment with a site-specific enclosure and installation. A transformer kVA value alone cannot describe the capability or installation requirements of the complete package.

Reviewed 14 November 2026

## Related equipment

[Oil-immersed transformers](https://kestvan.com/products/oil-transformers)

[Dry-type transformers](https://kestvan.com/products/dry-type-transformers)

[Compact substations](https://kestvan.com/products/compact-substations)

[Substation enclosures](https://kestvan.com/products/substation-enclosures)

[Project preparation assistant](https://kestvan.com/project-assistant)

## The practical answer

Freeze the electrical arrangement and the civil, thermal and cable interfaces together. Confirm which party supplies each interface, which drawings need approval and how the assembled substation will be accepted.

## Define the complete electrical package

Start with transformer voltage ratio, capacity, frequency and connection group, then add the MV switching, LV distribution, metering, protection and auxiliary requirements. Clarify whether the enclosure, interconnections, cables and terminals are included. Keep the package rating distinct from the nameplate of a transformer installed inside it.

- Provide the single-line diagram and a schedule of supplied and excluded items.
- State normal loading, contingency duty and future expansion needs.
## Treat the enclosure as a thermal environment

Ambient temperature, solar exposure, equipment losses and air paths affect conditions inside the substation. Larger ventilation openings are not a universal answer: dust, moisture and condensation also matter. Request a thermal assessment for the assembled arrangement, with cooling and anti-condensation provisions appropriate to the site.

- Identify altitude, temperature range, humidity, pollution and coastal exposure.
- Coordinate ventilation openings with fire, weather and security requirements.
## Separate ingress, impact and site requirements

IP describes enclosure protection against access and ingress; IK addresses specified external mechanical impacts. Neither alone defines corrosion resistance, flood protection or every site hazard. Agree compartment requirements, cable-gland details and the maintained enclosure condition after site work. Foundation level, drainage and earthing connections need their own drawings.

- Confirm cable entry direction, conductor arrangement and termination space.
- Reserve operating access, door movement, pressure relief and maintenance routes.
## Close the civil and logistics interfaces

Before fabrication, agree foundation loads, fixing points, lifting provisions, transport envelope and delivery route. Identify who unloads, positions, terminates, tests and energizes the unit. Factory acceptance of the package and site verification after transport are separate milestones; utility authorization remains part of the installation process.

- Request approved general-arrangement, foundation and cable-interface drawings.
- Tie packing, storage limits and site checks to the supplied instructions.
## Project interface checklist

Use this working checklist to connect buyer, utility and design inputs with the documents to review. It provides neither universal dimensions nor a final design. Supply, installation and approval responsibilities must be agreed by the relevant parties in the technical agreement.

**Nine interfaces to confirm before approving the equipment arrangement**

| Interface | Inputs & drawings | Supply & site responsibility | Status / revision |
| --- | --- | --- | --- |
| MV incoming supply & network | Network voltage, frequency, fault duty and incoming cables; single-line diagram and utility requirements. | To be agreed in the technical agreement. | Pending confirmation Revision: to be entered |
| Protection, CT/VT & settings | Protection and metering duties, CT/VT and auxiliaries; coordination study and settings submitted for approval. | To be agreed in the technical agreement. | Pending confirmation Revision: to be entered |
| Transformer rated duty | Capacity, ratios, connection group, impedance, load and cooling; agreed data sheet and terminal drawing. | To be agreed in the technical agreement. | Pending confirmation Revision: to be entered |
| MV equipment–transformer connection | Cable and termination types, entry and bending conditions; terminal and civil drawings for both ends. | To be agreed in the technical agreement. | Pending confirmation Revision: to be entered |
| Transformer–LV connection | Loads, feeders, current and fault duty, busbar or cable link; LV diagram and connection drawings. | To be agreed in the technical agreement. | Pending confirmation Revision: to be entered |
| Earthing-grid boundary | System earthing and site design; equipment bonding points, connection schedule and verification plan. | To be agreed in the technical agreement. | Pending confirmation Revision: to be entered |
| Foundation, openings & handling | Loads, drainage, openings and route constraints; approved foundation, lifting and transport documents. | To be agreed in the technical agreement. | Pending confirmation Revision: to be entered |
| Ventilation & total heat losses | Site climate, enclosure and total equipment losses; ventilation layout and relevant thermal assessment. | To be agreed in the technical agreement. | Pending confirmation Revision: to be entered |
| Auxiliaries, controls & handover | AC/DC supply, alarms, interlocks and communication; terminal/I/O lists, point map and agreed site handover plan. | To be agreed in the technical agreement. | Pending confirmation Revision: to be entered |

## Inputs to prepare

- Single-line diagram and equipment scope
- Transformer and feeder duty schedule
- Site climate and environmental conditions
- Foundation, drainage and earthing drawings
- Cable entry, access and lifting constraints
- Factory and site acceptance responsibilities
## Common specification mistakes

- Assuming enclosure dimensions from kVA alone.
- Specifying a high IP value without checking temperature and ventilation.
- Leaving unloading, cable termination or commissioning responsibilities undefined.
## Questions from project buyers

### Can the transformer nameplate rating be used as the substation package rating?

Not automatically. The surrounding enclosure and connected equipment influence the assembled package. Confirm its declared duty and thermal verification for the proposed installation.

### Does IP protection make an enclosure suitable for every outdoor site?

No. Impact, corrosion, solar heating, condensation, drainage and flood exposure are separate questions. The site specification must address the relevant conditions explicitly.

## Standards & further reading

These manufacturer and utility documents are method examples for their particular equipment or network. They do not approve Kestvan equipment or establish universal dimensions, clearances or protection settings.

- [IEC 62271-202:2022 — AC prefabricated substations](https://webstore.iec.ch/en/publication/66264)
- [IEC 60529:1989+AMD1:1999+AMD2:2013 — IP code](https://webstore.iec.ch/en/publication/2452)
- [IEC 62262:2002+AMD1:2021 — IK code](https://webstore.iec.ch/en/publication/71109)
- [Schneider Electric Electrical Installation Guide — ventilation in MV substations](https://www.electrical-installation.org/enwiki/Ventilation_in_MV_Substations)
- [Ausgrid NS117 — network-specific substation requirements](https://www.ausgrid.com.au/asp-and-contractors/technical-document-library/ns117)
- [Ringmaster AirSeT — protection setting review example](https://productinfo.se.com/ringmaster-airset/viewer?docidentity=VIP400VIP410-7FC871FE&extension=xml&lang=en&manualidentity=OperationalAndMaintenanceManualRing-451F2D3F)
These guides support project definition. Final ratings, protection settings, installation and acceptance criteria require the project engineer’s review against the applicable specification and local rules.

[Discuss your equipment requirements](https://kestvan.com/contact)

[Project preparation assistant](https://kestvan.com/project-assistant)
