Full-load current follows from the rated power and the rated voltage of the winding. The figure is the starting point for cables, busbars and breakers, not the final answer.

Reviewed 14 November 2026

## Related equipment

[Oil-immersed transformers](https://kestvan.com/products/oil-transformers)

[Dry-type transformers](https://kestvan.com/products/dry-type-transformers)

[Project preparation assistant](https://kestvan.com/project-assistant)

## The practical answer

Use the rated kVA and the secondary voltage printed on the nameplate, then check loading, ambient conditions and protection before fixing conductor and breaker sizes.

## The formula

For a three-phase transformer, rated current I (A) = S (kVA) / [√3 × U (kV)], where S is the rated power and U the rated line-to-line voltage of the winding considered.

- Keep kVA with kV, or VA with V. Mixing kVA with volts gives a result 1,000 times too small.
- For a single-phase transformer, I (A) = S (kVA) / U (kV).
- The value applies at rated voltage on the principal tapping. On another tapping the current of that winding changes with the tapping voltage.
## Reference values on the low-voltage side

Calculated values, rounded to the nearest ampere. They are arithmetic results, not the guaranteed data of an offered unit.

| Rated power (kVA) | Current at 400 V (A) | Current at 415 V (A) | Current at 433 V (A) |
| --- | --- | --- | --- |
| 100 | 144 | 139 | 133 |
| 250 | 361 | 348 | 333 |
| 400 | 577 | 556 | 533 |
| 500 | 722 | 696 | 667 |
| 630 | 909 | 876 | 840 |
| 800 | 1,155 | 1,113 | 1,067 |
| 1,000 | 1,443 | 1,391 | 1,333 |
| 1,250 | 1,804 | 1,739 | 1,667 |
| 1,600 | 2,309 | 2,226 | 2,133 |
| 2,000 | 2,887 | 2,782 | 2,667 |
| 2,500 | 3,608 | 3,478 | 3,333 |

## Before sizing cables and breakers

The rated current says what the transformer can carry continuously under its rated conditions. Conductors and protective devices also depend on how the installation is built and operated.

- Use the no-load secondary voltage on the nameplate. A transformer for a 415 V system is often rated 433 V at no load, and one for a 400 V system 410 V or 420 V.
- Check grouping, ambient temperature and installation method for cables, and the enclosure temperature for busbars and breakers.
- Full-load current is not fault current. Short-circuit duty depends on the transformer impedance and the upstream network.
- On the high-voltage side the same 1,000 kVA draws about 52.5 A at 11 kV and 17.5 A at 33 kV.
## Inputs to prepare

- Rated power in kVA
- Rated primary and no-load secondary voltage
- Frequency and tapping range
- Load profile: continuous, peak and future extension
- Ambient temperature and installation conditions
## Common specification mistakes

- Using the system nominal voltage when the nameplate shows a different no-load secondary voltage
- Taking full-load current as the breaker setting without checking the load and the cable
- Dividing kW by voltage: transformer ratings are in kVA, so power factor must not be applied twice
## Questions from project buyers

### What is the full-load current of a 1,000 kVA transformer?

About 1,443 A at 400 V, 1,391 A at 415 V and 1,333 A at 433 V on the low-voltage side of a three-phase unit.

### Does a higher secondary voltage reduce the current?

Yes. For the same kVA the current falls in proportion as the voltage rises, which is why the nameplate voltage must be used in the calculation.

## Standards & further reading

- [IEC 60076-1:2011 — Power transformers, General](https://webstore.iec.ch/en/publication/588)
These guides support project definition. Final ratings, protection settings, installation and acceptance criteria require the project engineer’s review against the applicable specification and local rules.

[Discuss your equipment requirements](https://kestvan.com/contact)

[Project preparation assistant](https://kestvan.com/project-assistant)