# Technical knowledge | Kestvan

Practical guides for defining distribution equipment, resolving interfaces and preparing a clear technical enquiry.

Canonical page: https://kestvan.com/knowledge-center

Technical knowledge

Practical guides for defining distribution equipment, resolving interfaces and preparing a clear technical enquiry.

[Prepare your project](https://kestvan.com/project-assistant)

[Explore the guides](https://kestvan.com/knowledge-center#guides)

## Start with the project, then select the equipment.

Use the preparation assistant for three-phase current, segmented loss-energy estimates and a project brief. Follow the guides to identify the questions a quotation needs to answer.

[Project preparation assistant](https://kestvan.com/project-assistant)

## Transformer engineering

### [Transformer sizing and load profiles](https://kestvan.com/guides/transformer-sizing-load-profile)

A rating depends on the load and operating conditions. Connected equipment alone does not determine the required kVA.

[Read the guide](https://kestvan.com/guides/transformer-sizing-load-profile)

### [Transformer impedance and fault level](https://kestvan.com/guides/transformer-impedance-fault-level)

Impedance affects fault current, voltage behavior and load sharing. Its percentage is neither a loss percentage nor a switchboard fault rating.

[Read the guide](https://kestvan.com/guides/transformer-impedance-fault-level)

### [Transformer testing and acceptance records](https://kestvan.com/guides/transformer-testing-acceptance)

Acceptance requires agreed criteria and traceable results. Factory testing, design evidence and site commissioning answer different questions.

[Read the guide](https://kestvan.com/guides/transformer-testing-acceptance)

### [Transformer site conditions and installation planning](https://kestvan.com/guides/transformer-site-installation)

Usable rating depends on the real thermal environment and installation. Agreeing requirements before delivery helps prevent foundation, access, ventilation and connection mismatches.

[Read the guide](https://kestvan.com/guides/transformer-site-installation)

### [Transformer full-load current: formula and 100–2,500 kVA reference values](https://kestvan.com/guides/transformer-full-load-current)

Full-load current follows from the rated power and the rated voltage of the winding. The figure is the starting point for cables, busbars and breakers, not the final answer.

[Read the guide](https://kestvan.com/guides/transformer-full-load-current)

## Power systems & integration

### [Switchgear ratings and protection: what the project must specify](https://kestvan.com/guides/switchgear-ratings-protection)

A voltage class and a cabinet model do not define a switchgear package. Begin with the network at the connection point, then match the switching, protection and operating functions.

[Read the guide](https://kestvan.com/guides/switchgear-ratings-protection)

### [Compact substations: electrical, civil and delivery interfaces](https://kestvan.com/guides/compact-substation-project-interfaces)

A prefabricated substation joins electrical equipment with a site-specific enclosure and installation. A transformer kVA value alone cannot describe the capability or installation requirements of the complete package.

[Read the guide](https://kestvan.com/guides/compact-substation-project-interfaces)

### [Solar and storage projects: define the grid interfaces first](https://kestvan.com/guides/renewable-energy-grid-interfaces)

A solar or storage project is more than an inverter power total and a transformer rating. The grid connection, operating modes and responsibilities between packages determine which equipment specification is meaningful.

[Read the guide](https://kestvan.com/guides/renewable-energy-grid-interfaces)

### [Industrial power and control: coordinate cables, drives, UPS and PLCs](https://kestvan.com/guides/industrial-power-control-integration)

Industrial reliability depends on the connections between packages as much as the devices themselves. A coordinated enquiry describes power flow, essential loads, operating sequences and the interfaces that must work together.

[Read the guide](https://kestvan.com/guides/industrial-power-control-integration)

## From an initial requirement to a reviewable equipment scope

- Define the operating duty Prepare the load profile, network data, site conditions and available drawings.
- Resolve equipment interfaces Identify electrical, mechanical, control and protection boundaries before comparing offers.
- Plan the evidence Agree the technical deviations, inspection points and handover documents with the quotation.
[Discuss your equipment requirements](https://kestvan.com/contact)

## More buyer resources

[Transformer RFQ guide](https://kestvan.com/distribution-transformer-rfq)

[Transformer loss comparison](https://kestvan.com/transformer-loss-comparison)

[Voltages and standards](https://kestvan.com/voltage-and-standards)

[Transformer Quotation Review: Technical Deviations & Evidence](https://kestvan.com/transformer-quotation-comparison)

[Transformer reference tables](https://kestvan.com/technical-data)

These guides support project definition. Final ratings, protection settings, installation and acceptance criteria require the project engineer’s review against the applicable specification and local rules.