# Electrical project preparation tools | Kestvan

Calculate balanced three-phase rated current and prepare a clear equipment brief, with project inputs and missing documents ready for a technical discussion.

Canonical page: https://kestvan.com/project-assistant

[Home](https://kestvan.com/)

PROJECT PREPARATION

Check a basic electrical quantity, identify the information still needed and bring a structured starting point to the next technical conversation.

These tools work in your browser. Inputs are not saved or sent; an enquiry is submitted only on the contact page.

## Balanced three-phase rated current

Use apparent power and line-to-line RMS voltage. The result is a current calculation, not a cable, busbar or circuit-breaker selection.

Calculator inputs: power above 0 and up to 1,000,000 kVA; voltage above 0 and up to 500 kV. These limits do not state an available product rating.

Calculated line current

I (A) = S (kVA) / [√3 × ULL (kV)]

Balanced three-phase apparent power; line-to-line RMS voltage. Not applicable to single-phase or unbalanced systems. Verify frequency, temperature, installation, fault duty and protection separately.

## Prepare a project brief

Fill in what you know. Leave unknown items blank; the brief keeps them visible as questions to resolve. No contact details are required here.

### Your local brief

Review the text, then copy or download it. To send an enquiry, open the contact page and submit it there.

### Documents and interfaces to prepare

Keep these points in the technical conversation. Select equipment and an application above to include the relevant checklist in your brief.

### All projects

Single-line diagram; load list and operating modes; utility connection requirements; supply boundaries; applicable standards; drawing, test and delivery document requirements.

## Transformer

Capacity, voltage ratio and frequency; vector group, taps and impedance; losses with reference temperature; cooling and site conditions; termination arrangement and agreed tests.

## Compact substation

MV and LV equipment boundaries; transformer interfaces; protection and interlocks; earthing, ventilation and enclosure; cable entries, foundations, lifting and access dimensions.

## MV/LV switchgear

System voltage and insulation; rated current; breaking, making and short-time withstand duties kept distinct; protection, interlocks, access and required internal-arc classification.

## Control / automation

I/O and motor/load list; auxiliary power; signals and communications; interlock and control sequence; drawings, software responsibility and interface acceptance criteria.

## Power cable

Voltage class, conductor and insulation; load and fault duty; route and installation method; ambient and grouping; length, voltage-drop requirement and terminations.

## Loss energy over a load profile

Enter your own no-load and rated load losses, then divide the energised period into up to three constant-load segments. No product values are prefilled.

Use any assessment period above 0 and up to 8,784 hours. This is not an assumption of 8,760 operating hours per year.

Load (%) is winding current / rated current × 100, or kVA / rated kVA × 100 at the same voltage. It is not power factor or kW / rated kVA. Leave an unused segment entirely blank. Enter both values for every used segment; its hours must be non-negative. Segment hours must sum to H. Loads are 0–100%; overload is outside this model.

Leave the price blank to skip cost. Zero is valid. When entering a price, also name its currency; no exchange-rate conversion is made.

The example uses hypothetical losses: P₀ = 1 kW, Pₖ = 10 kW, 24 hours energised, with 12 hours at zero load and 12 at full load. These are not Kestvan product ratings.

### Calculated loss energy

- **No-load loss energy**: —
- **Load-dependent loss energy**: —
- **Total loss energy**: —
- **Cost of these losses**: —

Eloss (kWh) = P₀ (kW) × H (h) + Pₖ (kW) × Σ[(βi/100)² × hi]

Load (%) is winding current / rated current × 100, or kVA / rated kVA × 100 at the same voltage. It is not power factor or kW / rated kVA. This estimates energy dissipated as losses, not delivered energy, efficiency, complete ownership cost or return on investment. No-load loss continues while energised, including zero-load segments. Load loss uses the sum of squared load fractions multiplied by segment hours; squaring an average load fraction is not equivalent.

Use loss values at the agreed reference conditions. No conversion between 75 °C and 120 °C is performed. Harmonics, actual temperature changes and auxiliary consumption are outside this estimate; their exclusion does not mean they are zero.

## Bring the brief to a technical conversation.

Share your drawings, requirements and open questions. We can coordinate the equipment configuration, documentation and next technical clarification.

[Open the contact page](https://kestvan.com/contact)

[RFQ preparation guide](https://kestvan.com/distribution-transformer-rfq)

[Technical reference tables](https://kestvan.com/technical-data)