The practical answer
Use a transformer-only calculation for early discussion, then coordinate the complete network before choosing fault ratings or protection settings.
Read impedance on a defined base
The short-circuit impedance uk% is tied to stated rated power, winding voltage, frequency, reference temperature and tap conditions. Comparing percentages without those bases can conceal a different actual impedance.
- For a three-phase transformer referred to one winding, Zt(Ω) = (uk% / 100) × U(V)² / S(VA), where U is that winding's line-to-line voltage and S its three-phase rated apparent power.
- Keep volts with volt-amperes in this expression. For rated line current, I(A) = S(kVA) / [√3 × U(kV)].
- Impedance includes resistance and reactance. It is not a direct measure of efficiency, and the percentage should not be described as an energy-loss percentage.
Understand the simplified terminal estimate
For one transformer, a balanced three-phase bolted terminal fault, an infinitely strong upstream source and no other infeed, Ik ≈ In × 100 / uk%. This restricted model is not a guaranteed maximum for every real network.
- Illustrative inputs only: 1,000 kVA, 0.4 kV and 6% give approximately 1,443 A rated current and 24.1 kA terminal fault current.
- Those example numbers are not the guaranteed data of an offered Kestvan model. Use the proposed unit's agreed rating and impedance.
- The estimate does not resolve peak making current, asymmetry, earth faults, minimum fault levels or clearing time. These require the appropriate system study.
Coordinate the complete installation
Fault duty depends on the combined upstream network, transformer and conductors, including total resistance/reactance, operating mode and other sources. A transformer nameplate cannot establish every downstream equipment duty.
- Obtain utility fault data, source voltage assumptions, network R/X, cable or busbar lengths and the relevant operating configurations.
- Include parallel transformers and applicable motor, generator or inverter contributions with suitable models. A transformer-only estimate is not a universal upper bound.
- Coordinate switchgear breaking and making ratings, short-time withstand, protection selectivity and the earthing design. These are related but distinct checks.
Keep compatibility and evidence separate
Matching connection groups alone do not permit parallel operation. Review ratio, taps, phase relationship, impedance and X/R, neutral, earthing and protection together.
- Changing uk% can change fault current, voltage behavior and load sharing; the lowest available impedance is not automatically the best choice.
- IEC 60076-5 addresses thermal and dynamic effects of external short circuits. Specify the applicable verification evidence and its relevance to the offered design.
- Routine impedance measurement does not itself prove short-circuit withstand. Nor does the standard mean that every delivered unit must undergo a high-current withstand test.
Inputs to prepare
- Rated kVA, winding voltages, frequency and taps
- Guaranteed uk%, reference temperature and applicable tolerance
- Upstream fault level and resistance/reactance information
- Cable and busbar routes, sizes and lengths
- Parallel, normal and emergency source configurations
- Fault study, earthing and coordinated protection requirements
Common specification mistakes
- Calling impedance percentage a loss percentage
- Using the terminal estimate as final switchgear breaking capacity
- Approving parallel operation solely because vector groups match
Questions from project buyers
Does a lower impedance always improve a transformer proposal?
No. It can increase fault duty and affect voltage behavior and load sharing. Select it with the network design, rather than optimizing one number in isolation.
Is a routine impedance result a short-circuit withstand certificate?
No. It is a measured electrical characteristic. Thermal and dynamic withstand require agreed, design-relevant evidence, alongside separate delivered-unit routine records.