PROJECT PREPARATION
Turn project inputs into a useful brief.
Check a basic electrical quantity, identify the information still needed and bring a structured starting point to the next technical conversation.
These tools work in your browser. Inputs are not saved or sent; an enquiry is submitted only on the contact page.
Balanced three-phase rated current
Use apparent power and line-to-line RMS voltage. The result is a current calculation, not a cable, busbar or circuit-breaker selection.
Calculator inputs: power above 0 and up to 1,000,000 kVA; voltage above 0 and up to 500 kV. These limits do not state an available product rating.
Calculated line current
I (A) = S (kVA) / [√3 × ULL (kV)]
Balanced three-phase apparent power; line-to-line RMS voltage. Not applicable to single-phase or unbalanced systems. Verify frequency, temperature, installation, fault duty and protection separately.
Prepare a project brief
Fill in what you know. Leave unknown items blank; the brief keeps them visible as questions to resolve. No contact details are required here.
Your local brief
Review the text, then copy or download it. To send an enquiry, open the contact page and submit it there.
Documents and interfaces to prepare
Keep these points in the technical conversation. Select equipment and an application above to include the relevant checklist in your brief.
All projects
Single-line diagram; load list and operating modes; utility connection requirements; supply boundaries; applicable standards; drawing, test and delivery document requirements.
Transformer
Capacity, voltage ratio and frequency; vector group, taps and impedance; losses with reference temperature; cooling and site conditions; termination arrangement and agreed tests.
Compact substation
MV and LV equipment boundaries; transformer interfaces; protection and interlocks; earthing, ventilation and enclosure; cable entries, foundations, lifting and access dimensions.
MV/LV switchgear
System voltage and insulation; rated current; breaking, making and short-time withstand duties kept distinct; protection, interlocks, access and required internal-arc classification.
Control / automation
I/O and motor/load list; auxiliary power; signals and communications; interlock and control sequence; drawings, software responsibility and interface acceptance criteria.
Power cable
Voltage class, conductor and insulation; load and fault duty; route and installation method; ambient and grouping; length, voltage-drop requirement and terminations.
Loss energy over a load profile
Enter your own no-load and rated load losses, then divide the energised period into up to three constant-load segments. No product values are prefilled.
Use any assessment period above 0 and up to 8,784 hours. This is not an assumption of 8,760 operating hours per year.
Load (%) is winding current / rated current × 100, or kVA / rated kVA × 100 at the same voltage. It is not power factor or kW / rated kVA. Leave an unused segment entirely blank. Enter both values for every used segment; its hours must be non-negative. Segment hours must sum to H. Loads are 0–100%; overload is outside this model.
Leave the price blank to skip cost. Zero is valid. When entering a price, also name its currency; no exchange-rate conversion is made.
The example uses hypothetical losses: P₀ = 1 kW, Pₖ = 10 kW, 24 hours energised, with 12 hours at zero load and 12 at full load. These are not Kestvan product ratings.
Calculated loss energy
- No-load loss energy
- —
- Load-dependent loss energy
- —
- Total loss energy
- —
- Cost of these losses
- —
Eloss (kWh) = P₀ (kW) × H (h) + Pₖ (kW) × Σ[(βi/100)² × hi]
Load (%) is winding current / rated current × 100, or kVA / rated kVA × 100 at the same voltage. It is not power factor or kW / rated kVA. This estimates energy dissipated as losses, not delivered energy, efficiency, complete ownership cost or return on investment. No-load loss continues while energised, including zero-load segments. Load loss uses the sum of squared load fractions multiplied by segment hours; squaring an average load fraction is not equivalent.
Use loss values at the agreed reference conditions. No conversion between 75 °C and 120 °C is performed. Harmonics, actual temperature changes and auxiliary consumption are outside this estimate; their exclusion does not mean they are zero.
Bring the brief to a technical conversation.
Share your drawings, requirements and open questions. We can coordinate the equipment configuration, documentation and next technical clarification.