Kestvan transposed aluminium conductor

Kestvan supplies transposed aluminium conductors to customer drawings for transformer and reactor windings. Specify the strand position sequence, transposition pitch or repeat length, and finished cross-section. Reference constructions include seven-wire bundles and layered arrangements.

Request a conductor quotation

Transposed aluminium conductor quotes and samples About Kestvan

Double-layer conductor construction reference photo
Double-layer conductor construction reference photo

Reference specification ranges

Strand count and conductor dimensions
ConstructionStrand countIndividual wire diameter (mm)Finished height (mm)Finished width (mm)Stack count
Transposed conductor with seven-wire bundles7 per bundle————
Double-layer transposed conductor2×3–2×200.8–5.23.8–9.38–52—
Combined double-layer transposed conductor—0.8–5.28–288–52≤4

Values describe reference configurations. Confirm the specified combination against the project drawing, as the range limits may not be available together. A dash indicates a value that was not specified.

Conductor construction

A transposition schedule moves strands through defined positions along the length. An option with seven wires per bundle, double layer or combined double-layer construction can be reviewed against the required layout and repeat length.

Use this option for transformer or reactor coils whose electrical design specifies strand transposition. Include the operating current and frequency profile, conductor cross-section and lead arrangement for technical review.

Transposed aluminium conductor — Conductor construction
Construction illustration. Dimensions and strand arrangement follow the approved drawing.
Conductor processing photos

Specification and acceptance requirements

ParameterWhat to specify
Strand and layer configurationSpecify the seven-wire bundle option or the double-layer or combined double-layer arrangement, aluminium grade and strand dimensions in mm.
Pitch and sequenceSet the transposition pitch or repeat length in mm, position sequence and end positions.
Finished profile and toleranceSet the final width and height or diameter in mm and tolerances at the transposition zones.
Insulation and electrical testsDefine strand insulation and wrapping, maximum DC resistance in Ω/km at the stated temperature and strand isolation checks.
Bending, joints and reelsSpecify bend direction and minimum radius, permitted joints, continuous length in m and the reel drawing.

Send the winding drawing and service conditions. The quotation confirms the available construction, aluminium grade, dimensions, insulation, inspection limits and reel requirements for the project.

Material data and inspection

Transposed aluminium conductor quotes and samples

Transposed aluminium conductor RFQ worksheet

Open the CSV in Excel and fill in the blank column from your winding drawing. Use these details in your enquiry to Kestvan. Sample availability, final dimensions and inspection scope are confirmed for each order.

Download editable Excel CSV

Enter the drawing number and revision with your enquiry. For a trial sample, include the requested length, dimensional tolerances, insulation and any DC resistance acceptance limit at the specified temperature. Sample availability and test scope are confirmed for each project.

Comparing DC resistance in conductor sample reports

These illustrative readings use the same complete-conductor connection and a measured temperature of 20 °C. Divide resistance in milliohms by gauge length in metres to obtain ohms per kilometre.

Record the sample ID, drawing revision, measured temperature and length between voltage taps. Identify the strands connected for the measurement and whether the test covered one strand or the whole conductor. Compare against the project limit using the agreed test connection and temperature correction.

IEC 60851-5 Test 5 covers electrical resistance of winding wire. The project specification determines the applicable test method and edition. IEC 60851-5:2026

Mingyu Ma, Sales Manager at Kestvan, handles winding conductor enquiries. He coordinates drawings, sample requirements and the information needed for a quotation.

Discuss conductor requirements

Product selection and enquiry

When to use this product

The winding drawing determines the strand-position changes and end arrangement of a transposed aluminium conductor. Check the finished dimensions through the transposition zones for coil fit.

What to send for a quotation

Send the current drawing revision and state the strand insulation and permitted joints. For electrical acceptance, give the reference temperature and identify whether the DC resistance limit applies to a strand or the whole conductor.

From the winding drawing to reel acceptance

Kestvan supplies transposed aluminium conductors for transformer and reactor windings to customer drawings. Use the winding drawing to review the conductor construction, then carry its revision through the quotation, sample and reel acceptance records.

Check the construction against the drawing

Read the ranges for the selected construction separately. Check the strand arrangement and finished dimensions together against the winding drawing.

Reference ranges by construction

Keep sample and drawing references on the enquiry

Enter the approved drawing revision and selected construction in the enquiry. Include a traceable sample ID when a sample is available.

Transposed aluminium conductor enquiry worksheet

Match the reel record to the agreed acceptance criteria

On receipt, match the reel or batch ID and the drawing revision. Check the measured complete-conductor DC resistance together with the test connection and temperature against the agreed criterion. The illustrative calculation shows how to interpret a result.

Illustrative resistance calculation

Agree what to check before using the first reel

DecisionWhat to verify
Position cycle and reel endsIdentify the released drawing revision. Show the position sequence and specify whether the stated length is one transposition step or a full cycle. Mark strand identification and orientation at both ends.
Finished section at the windingAgree where to measure the insulated profile, including at transposition zones, and how to check it against the available winding space and bend limits.
Reel acceptance recordAgree how resistance is measured, whether the limit applies to a strand or the full conductor, the reference temperature, how permitted joints are recorded and the minimum continuous length per reel.

Check the project documents

Technical knowledgeExplore the guidesPrepare your project
WhatsAppRequest a quotation