International high-voltage substations

220 kV GIS for a ferronickel project in Kendari, Indonesia

A 220 kV GIS configuration of 33 bays, built at our Tai’an production base and installed at the substation of a ferronickel project in Kendari, Indonesia.

Discuss a similar project
Configuration overview220 kV
33GIS bays
33 GIS bays

Project configuration

Project location
Kendari, Indonesia
Voltage class
220 kV
Equipment package
33 GIS bays

Equipment package

  • 220 kV gas-insulated metal-enclosed switchgear
  • 33 GIS bays

Engineering considerations

Project reference. Equipment configuration and supply scope are defined for each new project.

Planning a similar installation?

Share your single-line diagram, capacity, voltage and installation conditions.

Discuss your project

Related configurations

WhatsAppRequest a quotation