International high-voltage substations

220 kV GIS for a captive power plant in Morowali, Indonesia

A 220 kV GIS configuration of 30 bays, built at our Tai’an production base for a captive power plant in Morowali, Indonesia.

Discuss a similar project
Configuration overview220 kV
30GIS bays
30 GIS bays

Project configuration

Project location
Morowali, Indonesia
Voltage class
220 kV
Equipment package
30 GIS bays

Equipment package

  • 220 kV gas-insulated metal-enclosed switchgear
  • 30 GIS bays

Engineering considerations

Project reference. Equipment configuration and supply scope are defined for each new project.

Planning a similar installation?

Share your single-line diagram, capacity, voltage and installation conditions.

Discuss your project

Related configurations

WhatsAppRequest a quotation